PRECAUTION DURING EXCAVATION:

 

                   PRECAUTION DURING EXCAVATION:

                  There are following precaution is to be taken during excavation-

·        The width of trench is kept 30 to 45 cm more than the diameter of the pipe because the pipe is laid down in the trench easily.

·        The depth of trench from ground level is kept 90cm to 1m because the pipes not breakdown where pressure or load applied on the pipe.

·        The excavated soil is kept 1.5 mt away from corner of trench because it will not come in trench.

·        Plank shuttering used in soft soil if necessary.

·        The disturbance in traffic will be minimum and the traffic of one direction is almost  freely.

·        At the time of excavation of trench it is necessary that no damage of electric poles, trees which is available nearby trench.

·        In big residential areas the pipe line is kept open about 30 mt, and in less residential areas the pipe line is kept open about 100 mt.

·        if the distance is above this range then danger of fall any person or animal is create.  The arrangement of material care is very important which are used in excavation of trench.

             PRECAUTION TAKEN FOR TRAFFIC CONTROL:

             Following precautions can be taken for traffic control during excavation –

·        The work shall be carried in such a manner that it causes the least interruption to traffic.

·        Provide a safe alternate route for traffic.

·        Where it is necessary for traffic to cross open trenches, suitable bridges shall be provided.

·        Suitable signs indicating that a street is closed shall be placed.

            PREPARATION OF BEDDING:

·        Before laying of pipe lines the base of trench is kept in accurate slope with the help of boing rod.

·        Pipe is not laying directly in the trench because if the clay of trench is settle down then there is chance to break the pipe.

·        So, on the base of trench first of all laying brick ballast and pounding the brick ballast accurately.

·        Depth of trench is kept approximately 15 to 20 cm more in length of 1 mt where the joint of pipe is available because the joint of pipe is done easily.

·        If the soil is soft then a layer of cement concrete is provided on the brick ballast.

              HANDLING OF PIPES –

·        All pipes shall be lifted by means of reinforced canvas slings.

·        The pipes should be lifted by means o hooks to the ends of pipe.

·        All the open ends of the pipes shall be closed by means of end caps or polythene sheets before delivery to site.

·        After delivery to the site, these , end caps should not be removed until the pipes are ready  to the laid

·        All open ends of pipes in the trenches shall remain covered to prevent the entry of any  dirt, mud, stone.

·        The cover should be the water tight to prevent the entry of dirty water.

               TESTING OF PIPE LINES:

                After completion of the work the pipeline should be tested to detect the leakage if any in          the pipeline

                 (1)  Pressure test-

·        A section of the pipeline should be filled with water.

·        And pressure should be applied by pump.

·        The pressure is noted on the pressure gauge.

·        If the pressure on the gauge falls gradually, then it indicates the leakage in that section of pipeline.

                (2)   Leakage test by Empirical formula:

The allowable leakage is given by the relation

L = ND√P / 3.3

L = allowable leakage

N = number of joints

D = diameter of pipes

P = applied pressure

If the actual leakage is more than the allowable leakage then the leakage point should be detected and rectified accordingly

 

 

3brightstar.com

Greetings from [3brightstar.com], your one-stop shop for education, personal development, and subject-matter expertise. Our platform is committed to offering insightful information and important notes on a wide range of subjects, such as education, general knowledge, sports, civil engineering, and beauty, regardless of whether you are a student, professional, or enthusiast.